Plastic Basket injection moulder. The different design with several productions for plastic baskets for storage, plastic baskets for food and plastic baskets for clothes. And in next step our customer will desgn some other new production for plastic basket with handle and flower holes with artistic feeling.so for plastic basket with holes or withour holes or plastic basket with handles . you are welcomed to know more for our company .It is a LDPE plastic soft material basket for our Japan customer.
Mold details:
Type: | Injection mold | Core surface finish: | Polish |
Production Material: | LDPE | Cavity surface finish: | Texture |
No of Cavities: | 1x2 | Injection System | Cold Runner |
Core Material: | P20 with heat treated | Type of gating: | Directly gate |
Cavity Material: | P20 with heat treated | Ejection system: | Ejection block |
Slider material: | N/A | Lead time for T1 | 25 days |
Mold base steel: | 45# | Shot life: | 300 000 |
Place of Origin | China | Packaging: | Plywood Box |
Product Characters
1. 10 seconds injection molding cycle time
2. Short lead time comparing with our competitor
3. Good tactility with the soft material and excellent texture
4. Lower cost and flash controlling
Please note that this information is just for reference and don’t copy or use to others purposely.
Basket Mould Making Process:
Mould Shop Overview:
Our Certifications and Quality Control:
Basket injection moulder Packing and Logistic:
Our FAQ:
Q26 ) which express carrier are you working ?
We working for USP, Fedex, DHL, TNT and SF express .
Q 27) How many times mold trial for each project untill the approved condition normally ?
In our side , normally after 3 times mold trial , the mold will be ready for shipment . If the customer side have engineering change , it is need more time .
Q28) How many days I can get the T1 samples when we start the project ?
It depend on the mould size and how complex it is , for the small one , the normallt time need 4 weeks ; the bigger one need longer time .
Q29) How many days for our project from starting to ready for shipment ?
It depend on the mould size and how complex it is , for the small one it neet around more 2 weeks after the T1 samples; for the bigger one , it need more time .
Q30) What kind of files will you provide after the mold finished ?
The 2D mould drawing , the 3D full mold drawing , the steel certifications, the heat treatment certification, the hor runner documents , the production dimension inspection report , the mold trial report and some others if you want .
If you have any question or want to know more about our plastic basket injection moulder and basket injection molding production, please contact us freely.
Mold details:
Type: | Injection mold | Core surface finish: | Polish |
Production Material: | LDPE | Cavity surface finish: | Texture |
No of Cavities: | 1x2 | Injection System | Cold Runner |
Core Material: | P20 with heat treated | Type of gating: | Directly gate |
Cavity Material: | P20 with heat treated | Ejection system: | Ejection block |
Slider material: | N/A | Lead time for T1 | 25 days |
Mold base steel: | 45# | Shot life: | 300 000 |
Place of Origin | China | Packaging: | Plywood Box |